• E2010-241 - Arturo Mine plan of operations and expansion of Dee Gold Mine, Elko County - Comments due: 07/20/2010
  • E2010-240 - Expeditionary readiness course expansion, Nellis AFB - Comments due: 07/22/2010
  • E2010-239 - City of Elko water reclamation facility reuse site - Comments due: 08/02/2010
  • E2010-238 - Desert Hills dairy biodigester, Lyon County - Comments due: 07/06/2010
  • E2010-237 - Montezuma Pk. and Paymaster HMA gathers, Esmeralda County (No Link Available) - Comments due: 07/13/2010
  • E2010-236 - Habitat improvement and fuels reduction, Shell Cr. and Antelope Ranges, White Pine County - Comments due: 07/13/2010
  • E2010-235 - Conveyance of 807 acres of BLM land, Elko County - Comments due: 08/02/2010
  • E2010-234 - Mining of tailings and exploration of surrounding area, Manhattan Gulch Mine, Nye County - Comments due: 07/15/2010
  • E2010-233 - Silver King HMA gather, Lincoln County - Comments due: 07/13/2010
  • E2010-232 - New drinking water well, Walker Lake, Mineral County - Comments due: 07/12/2010
  • E2010-231 - Yerington arsenic treatment plant, Lyon County - Comments due: 07/08/2010
  • E2010-230 - Argenta barite mine expansion, Lander County - Comments due: 06/29/2010
  • E2010-229 - NDOT material site expansion, Pershing County - Comments due: 07/14/2010
  • E2010-228 - North Schell habitat restoration and fuels reduction, White Pine County - Comments due: 07/02/2010
  • E2010-227 - BLM national wild horse and burro strategy - Comments due: 07/29/2010
  • E2010-226 - Newlands Project water rights retirement program, Truckee-Carson River basins - Comments due: 06/24/2010
  • E2010-225 - Meteorological tower, Pacific Wind Development, Esmeralda County - Comments due: 07/08/2010
  • E2010-224 - Rattlesnake Canyon headcut stabilization project, Elko County - Comments due: 07/07/2010
  • E2010-223 - Pioche and Caselton wildland urban interface project, Lincoln County - Comments due: 06/25/2010
  • E2010-222 - Ash Canyon sagebrush restoration and fuels reduction, Lincoln County - Comments due: 06/25/2010
  • E2010-221 - Reveille HMA gather, Nye County - Comments due: 06/23/2010
  • E2010-220 - Habitat improvement and fuels reduction, Egan Range, White Pine County - Comments due: 06/28/2010
  • E2010-219 - Dave Creek Bull Trout habitat enhancement project, Elko County - Comments due: 06/23/2010
  • E2010-218 - V&T railway reconstruction project, Carson City and Storey and Lyon Counties - Comments due: 06/17/2010
  • E2010-217 - Long Canyon mineral exploration, Elko County - Comments due: 06/15/2010
  • E2010-216 - Kings Valley uranium exploration, Humboldt County - Comments due: 06/14/2010
  • E2010-215 - Winnemucca and Grass Valley fuelbreaks, Humboldt County - Comments due: 06/09/2010
  • E2010-214 - 225 kW hydro power plant, N. and S. Twin Rivers, Big Smokey Valley - Comments due: 06/08/2010
  • E2010-213 - Archaeological test excavations, Elephant Mt. Cave, Black Rock Desert - Comments due: 06/11/2010
  • E2010-212 - (No Link Available)
  • E2010-211 - (No Link Available)
  • E2010-210 - NextLight Boulder City 150MW solar power plant, Clark County - Comments due: 06/18/2010
  • E2010-209 - Battle Mountain Phase II water improvement project, Lander County - Comments due: 06/16/2010
  • E2010-208 - Meadow Creek bridge replacement, Elko County - Comments due: 06/14/2010
  • E2010-207 - EA for grazing permit renewal, Strawberry allotment, White Pine County - Comments due: 06/11/2010
  • E2010-206 - NextLight Silver State 400 MW PV solar plant, Clark County - Comments due: 06/04/2010
  • E2010-205 - Moriah HMA gather, White Pine County - Comments due: 06/15/2010
  • E2010-204 - NORA, lease of 12.5 acres of BLM land to Grace Lutheran Church, Las Vegas - Comments due: 06/22/2010
  • E2010-203 - Genesis-Bluestar mining expansion, NMC, Eureka County - Comments due: 06/07/2010
  • E2010-202 - Mineral material sites, 490 acres of new disturbance, Pershing County - Comments due: 05/28/2010
  • E2010-201 - Proposed gather, Montezuma Pk and Paymaster HMAs, Esmeralda County - Comments due: 05/24/2010
  • E2010-200 - Readiness Center EA, Floyd Edsall Training Center, NVARNG, North Las Vegas - Comments due: 06/02/2010
  • E2010-199 - 6,000 ft wildcat oil and gas well, Railroad Valley, Nye County - Comments due: 05/27/2010
  • E2010-198 - Round Hill GID street rehabilitation and repair, Douglas County - Comments due: 06/01/2010
  • E2010-197 - Expansion of lithium brine and lithium carbonate plant, Silver Peak, Esmeralda County - Comments due: 06/04/2010
  • E2010-196 - Van Sickle Bi-State Park water pipeline, Douglas County - Comments due: 05/28/2010
  • E2010-195 - Eldorado-Ivanpah 220kv transmission line, Clark County - Comments due: 06/03/2010
  • E2010-194 - Weepah Spring and Worthington Mts. widerness management plan, Lincoln County - Comments due: 06/25/2010
  • E2010-193 - Hollister underground mine expansion of activities, Elko County - Comments due: 05/19/2010
  • E2010-192 - Mountain City, Ruby Mts. and Jarbidge combined travel mgmt. project (No Link Available) - Comments due: 12/13/2010
  • E2010-191 - (No Link Available)
  • E2010-190 - Virginia Highlands fuels treatment project EA, Storey County - Comments due: 05/24/2010
  • E2010-189 - Round Mountain gold mine rapid infiltration system expansion, Nye County - Comments due: 05/10/2010
  • E2010-188 - Jersey Valley and Buffalo Valley geothermal plants, Pershing and Lander Counties - Comments due: 05/07/2010
  • E2010-187 - Island Mountain Project, mineral exploration, Elko County - Comments due: 05/24/2010
  • E2010-186 - NV Energy microwave and mobile energy project, Clark, Lincoln, White Pine, and Elko (No Link Available) - Comments due: 05/12/2010
  • E2010-185 - Carson City Water Reclamation Facility upgrades - Comments due: 05/18/2010
  • E2010-184 - SR 160 improvements, SR 159 to Mountain Springs, Clark County - Comments due: 05/25/2010
  • E2010-183 - Water pipeline for Van Sickle Bi-State Park, Douglas County (No Link Available) - Comments due: 05/10/2010
  • E2010-182 - Prison Hill Water Tank Number 2 replacement, Carson City - Comments due: 04/30/2010
  • E2010-181 - Wild horse gather, Reveille HMA, Nye County - Comments due: 04/28/2010
  • E2010-180 - Replace climbing hardware in wilderness area, Red Rock Canyon NCA, Clark County - Comments due: 05/05/2010
  • E2010-179 - Small arms range expansion EA, Nellis AFB - Comments due: 04/23/2010
  • E2010-178 - Upper Colony II fuels treatment project, Lyon County - Comments due: 05/12/2010
  • E2010-177 - Coyote Canyon and Dixie Meadows geothermal exploration, Churchill County - Comments due: 05/05/2010
  • E2010-176 - Vegetation treatment maintenance project, Elko and Eureka Counties - Comments due: 05/03/2010
  • E2010-175 - (No Link Available)
  • E2010-174 - Buffalo Canyon mineral exploration, Nye County - Comments due: 05/03/2010
  • E2010-173 - (No Link Available)
  • E2010-172 - Management plan for Trout Cr. Pasture, Elko County - Comments due: 04/28/2010
  • E2010-171 - Apex expansion project, 28 miles of 36-inch gas pipeline, Clark County - Comments due: 05/10/2010
  • E2010-170 - Currant Mountain Bighorn Sheep wildlife guzzler, White Pine County - Comments due: 04/15/2010
  • E2010-169 - Jobs Peak hazardous fuels reduction project, Douglas County - Comments due: 04/20/2010
  • E2010-168 - (No Link Available)
  • E2010-167 - Lake Mead NRA - Cottonwood Cove and Katherine Landing DCP/EIS (No Link Available) - Comments due: 07/23/2010
  • E2010-166 - (No Link Available)
  • E2010-165 - SE Lincoln Co. habitat conservation plan FEIS - Comments due: 04/19/2010
  • E2010-164 - Amargosa Farm Road solar energy project, Nye County (No Link Available) - Comments due: 04/28/2010
  • E2010-163 - Road material source site 100 acre expansion, Lincoln County - Comments due: 04/27/2010
  • E2010-162 - Schoolhouse Butte 440 acre land sale, Humboldt Co. - Comments due: 04/14/2010
  • E2010-161 - Heavenly Mt. Resort 2010 capital projects EA, Douglas, Alpine, Eldorado counties - Comments due: 04/09/2010
  • E2010-160 - NMC Sandman Project mineral exploration, 441 acre expansion, Humboldt Co. - Comments due: 04/12/2010
  • E2010-159 - Range improvements - fencing, pipeline, water trough, Coal Valley, Lincoln County - Comments due: 04/14/2010
  • E2010-158 - Clover Mt. and Tunnel Spring wilderness management plan, Lincoln County - Comments due: 04/12/2010
  • E2010-157 - Reconstruction of Glendale water treatment plant, Washoe County - Comments due: 04/16/2010
  • E2010-156 - Patua 60MW geothermal project, Lyon and Churchill Counties - Comments due: 04/09/2010
  • E2010-155 - Abandoned mine closures scoping, Schell Creek Range, White Pine County - Comments due: 04/07/2010
  • E2010-154 - (No Link Available)
  • E2010-153 - Hoyt Fire restoration project, Churchill County - Comments due: 03/30/2010
  • E2010-152 - EIS for continued operation of Nevada Test Site, request for information - Comments due: 03/31/2010
  • E2010-151 - Jakes Valley fuels reduction and sagebrush restoration, White Pine County - Comments due: 03/29/2010
  • E2010-150 - Wild horse and burro management levels, Monitor, Hot Creek, and Toquima ranges - Comments due: 03/26/2010
  • E2010-149 - Emergent Value Group oil and gas well, Pancake Range, White Pine County - Comments due: 03/17/2010
  • E2010-148 - N. Lemmon Valley Heppner Ph.7 Project, water line installation, Washoe Co. - Comments due: 03/18/2010
  • E2010-147 - Emigrant Mine project, open pit gold mine, Elko County - Comments due: 03/17/2010
  • E2010-146 - Continued mineral exploration, Big Springs Mine, Elko County - Comments due: 03/17/2010
  • E2010-145 - Dry Lake Valley integrated solar combined cycle project, Clark County - Comments due: 03/10/2010
  • E2010-144 - Water treatment facility upgrades, Yerington Paiute Tribe, Lyon County - Comments due: 03/02/2010
  • E2010-143 - Upper Las Vegas Wash conservation transfer area SEIS - Comments due: 03/18/2010
  • E2010-142 - Revised water well and pipeline for Ruth, White Pine County - Comments due: 02/24/2010
  • E2010-141 - 3-Bars ecosystem and landscape restoration project, Eureka County - Comments due: 02/25/2010
  • E2010-140 - Draft mercury storage EIS - Comments due: 03/24/2010
  • E2010-139 - Bald Mt. wildlife habitat enhancement project, Lander County - Comments due: 02/08/2010
  • E2010-138 - Renewal of right-of-way for seismic monitoring station, S. Pahroc Range Wilderness - Comments due: 02/17/2010
  • E2010-137 - White Pine emergency service building - Comments due: 02/11/2010
  • E2010-136 - NV Energy microwave and mobile radio project (No Link Available) - Comments due: 02/15/2010
  • E2010-135 - Panaca Farmstead Association, waste water improvements, Lincoln County - Comments due: 02/16/2010
  • E2010-134 - Wind energy testing towers, Green Wing Energy, Nye County - Comments due: 02/18/2010
  • E2010-133 - FEIS for Ruby Pipeline Project, natural gas pipeline, northern Nevada (No Link Available) - Comments due: 02/05/2010
  • E2010-132 - Robison Mines mineral exploration, Elko County - Comments due: 02/11/2010
  • E2010-131 - Pacific Solar 150MW photovoltaic power plant, 7,500 acres, Amargosa Valley - Comments due: 02/10/2010
  • E2010-130 - Indian Hills GID water line construction for arsenic mitigation - Comments due: 02/05/2010
  • E2010-129 - Paris Livestock grazing permit renewal, 1.4 million acres, Eureka, Nye, White Pine - Comments due: 02/08/2010
  • E2010-128 - Las Vegas resource management plan revision and EIS (No Link Available) - Comments due: 02/02/2010
  • E2010-127 - Replacement park property, City View Park, N. Las Vegas - Comments due: 02/02/2010
  • E2010-126 - Oil and gas well, Lake Valley, Lincoln County - Comments due: 01/27/2010
  • E2010-125 - Eagle HMA wild horse gather, Lincoln County (No Link Available) - Comments due: 01/25/2010
  • E2010-124 - 150MW photovoltaic generating facility, Boulder City - Comments due: 01/21/2010
  • E2010-123 - EA for term grazing permit renewal, Oak Springs and Cliff Springs allotments, Lincoln Co. - Comments due: 01/07/2010
  • E2010-122 - Dutchman Acres water system building, categorical exclusion, Humboldt Co. - Comments due: 01/21/2010
  • E2010-121 - Spring Valley 150MW wind power plant, White Pine County - Comments due: 01/14/2010
  • E2010-120 - Removal of Forest Service structures, Santa Rosa District - Comments due: 01/28/2010
  • E2010-119 - Fence reconstruction, Santa Rosa boundary and Lamance administration site, Humboldt Co. - Comments due: 01/28/2010
  • E2010-118 - Quaking Aspen fire rehabilitation, Lincoln County - Comments due: 01/14/2010
  • E2010-117 - Wild horse gather, Antelope Complex, Elko and White Pine Counties - Comments due: 01/25/2010
  • E2010-116 - (No Link Available)
  • E2010-115 - Drinking water well upgrades, Carson City - Comments due: 01/14/2010
  • E2010-114 - Coordination request, native vegetation restoration, Tuledad allotment, Washoe Co. - Comments due: 12/24/2009
  • E2010-113 - Wilson Creek and Deer Lodge Canyon HMA gathers, Lincoln County - Comments due: 01/08/2010
  • E2010-112 - Plymouth Interagency Facility, Douglas County - Comments due: 01/08/2010
  • E2010-111 - Black Rock NCA administrative facility, Washoe County - Comments due: 12/22/2009
  • E2010-110 - Water well and pipeline for Ruth, White Pine County - Comments due: 01/04/2010
  • E2010-109 - Renovation of Martin Creek Guard Station, Humboldt County - Comments due: 01/12/2010
  • E2010-108 - Standard Mine expansion, Pershing County - Comments due: 12/23/2009
  • E2010-107 - Heavenly Mountain Resort 2010 capital projects, Douglas County - Comments due: 01/13/2010
  • E2010-106 - Crescent Dunes solar energy project, Nye County - Comments due: 12/22/2009
  • E2010-105 - (No Link Available)
  • E2010-104 - DSEIS for ON Line Project, 500kV transmission line, Ely to Las Vegas (No Link Available) - Comments due: 12/29/2009
  • E2010-103 - Coeur Rochester Mine expansion, Pershing County - Comments due: 12/10/2009
  • E2010-102 - Terra-Gen Power geothermal exploration project, New York Canyon, Pershing, Churchill - Comments due: 12/08/2009
  • E2010-101 - Transfer of 5 acres of BLM land for a police substation, Clark County - Comments due: 12/21/2009
  • E2010-100 - Beatty Water and Sanitation District water treatment plant project, Nye County - Comments due: 12/03/2009
  • E2010-099 - Merger of Bald Mt. and Mooney Basin mines into North Operations Area, White Pine Co. (No Link Available) - Comments due: 12/09/2009
  • E2010-098 - Sawmill Fire rehabilitation, Lincoln County - Comments due: 12/02/2009
  • E2010-097 - Regional seed warehouse, Ely - Comments due: 12/30/2009
  • E2010-096 - Arsenic treatment unit, Carvers Mobile Home Park, Nye County - Comments due: 12/07/2009
  • E2010-095 - Boulder Bay community enhancement program, Crystal Bay (No Link Available) - Comments due: 12/31/2009
  • E2010-094 - TransWest 600kV transmission line, Lincoln and Clark Counties - Comments due: 12/01/2009
  • E2010-093 - EA for Kings Valley lithium exploration project, Humboldt County (No Link Available) - Comments due: 11/25/2009
  • E2010-092 - Rhyolite wind energy testing site and monitoring project, Nye County - Comments due: 11/30/2009
  • E2010-091 - (No Link Available)
  • E2010-090 - Manual and chemical treatment of non-native plants in the Lake Tahoe Basin (No Link Available) - Comments due: 11/19/2009
  • E2010-089 - Sloan Canyon NCA trails master plan EA, Clark County (No Link Available) - Comments due: 11/19/2009
  • E2010-088 - Expansion of Vista Pit at Twin Creeks Mine, Humboldt Co. - Comments due: 11/19/2009
  • E2010-087 - Sale of 878 acres of BLM land in the Reese River valley - Comments due: 11/20/2009
  • E2010-086 - Scoping for Salt Wells geothermal power plant project EIS - Comments due: 11/09/2009
  • E2010-085 - (No Link Available)
  • E2010-084 - (No Link Available)
  • E2010-083 - Bighorn sheep gather, N. and S. McCullough and Muddy Mts. Wilderness areas - Comments due: 11/03/2009
  • E2010-082 - (No Link Available)
  • E2010-081 - (No Link Available)
  • E2010-080 - Mt Grafton, S. Egan Range, Far S. Egans, Highland Ridge wilderness management plan scoping - Comments due: 11/17/2009
  • E2010-079 - Cathedral Well mineral exploration project - Comments due: 10/29/2009
  • E2010-078 - (No Link Available)
  • E2010-077 - Commercial outfitter and guide special recreation permit issuance (No Link Available) - Comments due: 10/29/2009
  • E2010-076 - (No Link Available)
  • E2010-075 - (No Link Available)
  • E2010-074 - Temporary grazing permit, Mount Airy allotment, Lander County - Comments due: 10/06/2009
  • E2010-073 - Middle Kyle Complex recreation area and admin facilities, Clark County (No Link Available) - Comments due: 11/10/2009
  • E2010-072 - 20 year extension of protection of Austin Administrative Site, Lander Co. - Comments due: 12/04/2009
  • E2010-071 - (No Link Available)
  • E2010-070 - Goodsprings energy recovery station EA, Clark County - Comments due: 10/20/2009
  • E2010-069 - I-15 corridor and local arterial improvements draft EIS, Las Vegas (No Link Available) - Comments due: 11/03/2009
  • E2010-068 - Big Den 2,607 acre fuels reduction project, Desatoya Mts., Churchill Co. - Comments due: 10/13/2009
  • E2010-067 - Hilltop Drive 120-acre material site expansion, Elko County (No Link Available) - Comments due: 10/12/2009
  • E2010-066 - 230 MW Searchlight wind power facility, Clark County - Comments due: 10/12/2009
  • E2010-065 - Hard Badger mineral exploration project, Elko County - Comments due: 10/16/2009
  • E2010-064 - (No Link Available)
  • E2010-063 - Wood Hills 40-acre material site expansion, Elko County (No Link Available) - Comments due: 09/29/2009
  • E2010-062 - Ely wastewater treatment pond upgrades - Comments due: 10/13/2009
  • E2010-061 - Oil and gas well, Papoose Canyon, Elko County (No Link Available) - Comments due: 09/29/2009
  • E2010-060 - Wastewater collection and treatment upgrades, Creech AFB and Indian Springs - Comments due: 09/29/2009
  • E2010-059 - EA for water and sewer project, Yerington - Comments due: 09/21/2009
  • E2010-058 - Red Stone development on Tenmile Creek, Elko County - Comments due: 09/22/2009
  • E2010-057 - New waterline for Devil's Gate GID, Eureka County - Comments due: 09/22/2009
  • E2010-056 - Arrowhawk fuels reduction and ecosystem enhancement project, Washoe Co. - Comments due: 09/17/2009
  • E2010-055 - Demonstration project for Nevada Stateline-to-Stateline Bikeway - Comments due: 09/17/2009
  • E2010-054 - EA for Tobin Range HMA and Sonoma HMA wild horse gathers - Comments due: 09/16/2009
  • E2010-053 - (No Link Available)
  • E2010-052 - Supplemental EIS for Kings Beach commercial core improvement project - Comments due: 10/13/2009
  • E2010-051 - EA for construction of military training facility, Sloan, NV - Comments due: 09/03/2009
  • E2010-050 - 441 acre expansion of NMC's Sandman Exploration Project, Humboldt Co. - Comments due: 09/10/2009
  • E2010-049 - (No Link Available)
  • E2010-048 - UEPA for Five Star mobile home park water treatment system, Silver Springs - Comments due: 09/09/2009
  • E2010-047 - (No Link Available)
  • E2010-046 - Scoping for grazing permit renewal, Crooks Lake allotment, Washoe County - Comments due: 08/28/2009
  • E2010-045 - Head-cut stabilization projects, Santa Rosa Ranger District - Comments due: 08/28/2009
  • E2010-044 - 2.4kW wind turbine, Dry Creek Gardens, Washoe Valley - Comments due: 08/24/2009
  • E2010-043 - (No Link Available)
  • E2010-042 - 93kW hydro generation project, Young Brothers Ranch, Lander Co. - Comments due: 08/24/2009
  • E2010-041 - 181kW photovoltaic system, Hutchens Ranch, Lander County - Comments due: 08/24/2009
  • E2010-040 - UEPA for Silver State photovoltaic power facility, Clark County - Comments due: 09/10/2009
  • E2010-039 - Green Monster and Dry Canyon mineral exploration projects, Nye County - Comments due: 09/10/2009
  • E2010-038 - (No Link Available)
  • E2010-037 - Map and sample landfill next to Reid Gardner power plant, Clark Co. - Comments due: 08/19/2009
  • E2010-036 - SDD for sheep grazing on Sand Springs allotment, Nye County - Comments due: 08/20/2009
  • E2010-035 - DEIS for Round Mountain mine expansion project, Nye County (No Link Available) - Comments due: 09/10/2009
  • E2010-034 - Minden-Gardnerville Sanitation District cogeneration project - Comments due: 09/11/2009
  • E2010-033 - Audit, AM Smith and River Mt. water treatment facilities, SNWA - Comments due: 08/27/2009
  • E2010-032 - New well and arsenic removal system, Five Star Mobile Home Park - Comments due: 08/27/2009
  • E2010-031 - FONSI for exploration drilling for a backup water source, Alamo GID, Lincoln County - Comments due: 08/27/2009
  • E2010-030 - Construction of a pipeline bypass for the Highland Canal, Mogul - Comments due: 08/27/2009
  • E2010-029 - Sale of 409 acres of BLM land, Antelope Valley, Lander County - Comments due: 09/04/2009
  • E2010-028 - EA for Simplot silica mine expansion, Clark County - Comments due: 08/24/2009
  • E2010-027 - 2009 triennial review of the Lahontan Basin Plan - Comments due: 09/08/2009
  • E2010-026 - Preparation of EIS for long-term storage of mercury in Hawthorne - Comments due: 08/13/2009
  • E2010-025 - Cave Valley Ranch rabbitbrush removal project, White Pine and Lincoln counties - Comments due: 08/07/2009
  • E2010-024 - Trails master plan for Sloan Canyon NCA, Clark County - Comments due: 08/19/2009
  • E2010-023 - New Colorado River bridge between Laughlin and Bullhead City - Comments due: 08/25/2009
  • E2010-022 - Walker River Basin acquisition program draft EIS - Comments due: 10/01/2009
  • E2010-021 - Preparation of an EIS for continued operation of the Nevada Test Site - Comments due: 09/25/2009
  • E2010-020 - EA for corral on McGuffy allotment, Lincoln County - Comments due: 08/03/2009
  • E2010-019 - (No Link Available)
  • E2010-018 - Recreation trail construction, Lamoille Canyon to Talbot Creek - Comments due: 08/20/2009
  • E2010-017 - King Solomon mineral exploration, Nye County - Comments due: 08/21/2009
  • E2010-016 - Crescent Dunes solar energy project, Tonopah - Comments due: 08/17/2009
  • E2010-015 - (No Link Available)
  • E2010-014 - Sewer interceptor relocation, Pittman Wash, Henderson - Comments due: 08/20/2009
  • E2010-013 - (No Link Available)
  • E2010-012 - Capital projects at Heavenly Mountain Resort, Douglas County - Comments due: 07/31/2009
  • E2010-011 - Ward Mt. campground project, White Pine County - Comments due: 08/06/2009
  • E2010-010 - Caliente commercial woodcutting areas - Comments due: 08/05/2009
  • E2010-009 - Wagon mineral exploration project, Newmont Mining Corp., Monitor Range - Comments due: 08/05/2009
  • E2010-008 - Barrel Springs mineral expiration, Round Mt. Gold Corp., Toquima Range - Comments due: 08/05/2009
  • E2010-007 - Draft integrated weed management plan (No Link Available) - Comments due: 08/05/2009
  • E2010-006 - Goldfiled wastewater treatment pond upgrades - Comments due: 08/05/2009
  • E2010-005 - Centennial geotechnical exploration project, Mt. Hamilton - Comments due: 07/29/2009
  • E2010-004 - Vegas to Reno OHV race EA - Comments due: 07/29/2009
  • E2010-003 - Rangeland health evaluation for Hubbard Vineyard allotment, Elko County (No Link Available) - Comments due: 07/29/2009
  • E2010-002 - Bottom Road sewer line extension, Churchill County - Comments due: 07/29/2009
  • E2010-001 - Frost Creek rangeland assessment scoping, Elko County - Comments due: 07/17/2009